Ticket Machines


Brighton Station ticket queue, originally uploaded by seadipper.

I have complained endlessly about Southern's so-called Fasticket machines since they were introduced in a hasty system-wide rollout in 2005. Nothing fundamental has been done to address the problems. They are cumbersome with a poor and non-intuitive program flow, a poor interface and a lack of reliability, especially the on-screen keyboard which passengers must use if they are not going to the most popular dozen or so destinations. The touch screens are either over-sensitive or unresponsive, and sometimes both, depending which part of the screen has to be touched.

Most people seem to take about two minutes to buy a ticket, with the result that queues can build up, and so one needs to allow ten minutes to get a ticket. When one considers that the government is willing to spend billions on a high speed, just to save a few minutes on a long journey, it makes no sense to force passengers to waste their time queuing to buy tickets.

Without making major changes to the software, an immediate improvement could be made if the station names could be typed from the keyboard used to enter the credit card PIN number, as on a mobile phone.

But frankly the machines are dreadful. I can buy a ticket from Uppsala to Stockholm in 15 seconds. The procedure there is

  1. swipe debit card
  2. select ticket type from one of a few buttons
  3. key in the two-digit destination code (choice of up to 100)
  4. wait 5 secs for ticket to be printed.

Of course it would be even quicker if the ticket machines were on the trains.

I gather from other sources that the problem is partly due to the regulatory authorities who set the standards. We should not have to put up with this bad technology. And why are complaints simply ignored?

Kommentarer

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...