tisdag 18 maj 2010
A haircut for the Great Western?
Another project that might benefit from a haircut is the package of schemes planned for the Great Western main line. These include Crossrail and its extension to Reading, reconstruction of the station and junction at Reading with a grade-separation of the Newbury and Bristol lines, and electrification to Newbury, Oxford, Bristol and Swansea.
The projects themselves are obviously worthwhile, but having them all going on at once will be disruptive. It all sounds too much. How will reliable services be maintained?
There are alternative routes, up to a point. There is the South-Western main line through Salisbury and Exeter, though capacity is limited. The Chiltern Railways proposal will eventually provide a good connection from Oxford to London via Bicester and High Wycombe.
This is a case where there many be a need for better phasing, which would also have the advantage of spreading out the cost over a longer period.
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
-
The Four Freedoms are a recipe for strife unless they are accompanied by a Fifth Freedom. Land needs to be free, free as air. And freedom to...
Inga kommentarer:
Skicka en kommentar