They are renewing the paving in this Conservation Area and they are making a complete mess of it as the blocks are too widely spaced. They had to fill in the gaps with wet cement which is wrong and it looks as if they did the pointing with their fingers. Either there wasn't a proper specification or it is bad workmanship and supervision. And all in a Conservation Area and costing a fortune. There is someone, somewhere, very incompetent.
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The British are phlegmatic, tolerant and slow to rouse. Thus there was no great reaction after the terrorist attack in July 2005. The murder...
-
The Four Freedoms are a recipe for strife unless they are accompanied by a Fifth Freedom. Land needs to be free, free as air. And freedom to...
Inga kommentarer:
Skicka en kommentar