They are renewing the paving in this Conservation Area and they are making a complete mess of it as the blocks are too widely spaced. They had to fill in the gaps with wet cement which is wrong and it looks as if they did the pointing with their fingers. Either there wasn't a proper specification or it is bad workmanship and supervision. And all in a Conservation Area and costing a fortune. There is someone, somewhere, very incompetent.
The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Kommentarer