One of the most costly elements of the proposed high speed railway, and one that will take the longest time to construct, is the subterranean terminus at Euston and the 10km tunnel to the Crossrail interchange at Old Oak Common.
The long tunnels will mean that the trains will have to be built to the special stringent standards of fire resistance required for underground trains, adding considerably to the cost.
If an alternative surface route could be found, this requirement could be relaxed, with consequent savings.
The previous posting suggests that there is spare capacity at Euston, currently taken up by the lightly used London suburban services operated on lines with DC electrification. This may be the key to avoiding the great expense of a new terminal and all the tunneling.
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The ultimate net zero lunacy is probably de-carbonising and trying to electrify the entire railway system. In the first place, the railways...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
2 kommentarer:
The tunnels will be shorter than the Severn Tunnel, and you don't see any additional fire regulations for trains that operate through there.
@TomW
The tunnels are 10km and there is the subterranean terminus. I would be surprised if the underground fire regulations did not apply. These affect things like the design and material used for seats, paints, cables, means of escape, etc, etc
Skicka en kommentar