More on the Chiltern Line option

High Speed Rail Command Paper (the official DfT report which you can download from the link on the right hand side of the web page) repays close study. One of the interesting things to be found there is the list of other options have actually been considered, including development of the Chiltern Line. This consists of five "packages", which are described in Table 2.1 of the document, which is reproduced below.

Package 1 Extra long distance capacity delivered through the operation of longer trains on the West Coast Main Line (WCML) with platform lengthening and other infrastructure enhancements.

Package 2 Extra long distance capacity delivered through an increase in train service frequencies on the WCML with supporting infrastructure enhancements including extra platforms at Euston and Manchester Piccadilly stations, grade separation of junctions and 4-tracking sections of route.

Package 3 Building on package 2, the capacity and maximum speed of the Chiltern route between London and Birmingham is enhanced to allow fast WCML London – Birmingham trains to be diverted to the Chiltern Line, releasing capacity on the WCML for other services. Associated infrastructure enhancements include electrification, short new alignments, 4-tracking sections of route and additional platforms at Euston, Birmingham Moor St. and Manchester Piccadilly stations.

Package 4
Building on package 3, London – Birmingham journey times are reduced to a minimum through further infrastructure enhancements including a new alignment between the Chiltern Line and the WCML in the Kenilworth area.

Package 5
Building on package 4, additional capacity is provided between Birmingham and Stafford to enable WCML services between London and the North West to be diverted to the Chiltern route, releasing capacity on the WCML for other services. Associated infrastructure enhancements include 4-tracking the route between Birmingham and Stafford and further 4-tracking of the Chiltern route.

Projects worth supporting
These projects, taken together, would lead to very substantial increases in capacity. They are worth supporting. If the upgrades were carried out in conjunction with other projects to provide alternative routes, disruption to existing services could be minimised.

It is unfortunate that in the overwhelming desire to construct a 250mph railway, these low-risk developments have been passed over. They could commence sooner rather than later and would clearly provide excellent value for money in their own right since they follow the busy M40 corridor.

It is to be hoped that these options will be re-examined before long as part of the alternative to the high speed line.

Kommentarer

Chafford sa…
Covered in much more detail in the Atkins Road and Rail Alternative Study:

http://www.dft.gov.uk/pgr/rail/pi/highspeedrail/alternativestudy/

At the above link, try the Strategic Outline Case and for more detail, the Rail Interventions Report.
Chafford sa…
The diagrams in the Strategic Outline report page 77 onwards are interesting. Paddington - Birmingham would be covered in 64 minutes.

The Atkins report isn't as positive about these upgrades as you are though. Significant upgrades will have a significant environmental impact on the Chilterns - the Chiltern line upgrade would involve a tunnel to avoid High Wycombe and a 125mph cut off line at Princes Risborough. The capacity upgrades would also be less - for a major Chiltern Line + WCML upgrade , around a 100% increase in capacity, compared with a 200% increase for a new high speed or conventional line (according to the Command Paper).

The costs would also be very high - package 4 £15 billion, package 5 £19 billion - as expensive as a new line!
Physiocrat sa…
Thanks for these comments. It looks as if it is one of those situations where much benefit, expecially capacity, can be gained at relatively low cost, but all the benefit is very expensive. It becomes increasingly expensive to shave-off additional minutes the schedule.

fFrom what you say, it looks as if package 3 is as far is it should go. But why avoid High Wycombe? It is an important centre in its own right. Since there is a speed restriction, all trains may as well call there and provide a service in both directions.

Construction costs are not the entire story. A 125mph railway is very much cheaper to equip and operate than one running at double the speed, and the benefits can be achieved incrementally - there is no need to wait for the entire project to be finished.

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...