Presumably as a parting shot before being shut down, the East of England Development Agency put out a wish-list for improvements to the Great Eastern main line to Ipswich and Norwich, including new trains.
The worrying thing about this was the number of things that were stirred into the pot. Necessary infrastructure improvements are one thing. New trains are another, especially since it is now accepted that the mark 3 fleet presently in use has an economic service life of at least sixty years and new trains offer the passenger little if anything more.
This is a good example of the wasteful and profligate attitudes that characterised the Labour administration and the bureaucrats and consultants who were living off the system. We are now all about to pay the price.
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The ultimate net zero lunacy is probably de-carbonising and trying to electrify the entire railway system. In the first place, the railways...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
Inga kommentarer:
Skicka en kommentar