Church alterations
St Mary Magdalen's Catholic Church, Brighton, has gone through a series of changes over the past six months. The picture is of the approved layout but it was constructed in thick ply to see how it worked. It was not satisfactory and after a few weeks was changed, which was easily done due to the temporary construction.
The edge of the platform and the altar was moved further back. The steps were extended all the way across and returned on either side. The priest's chair stands on a plinth at the same level as the bottom step on the north side. This will probably be the final arrangement.
The idea of having a temporary structure proved a good investment as it could be tested without spending large sums of money.
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The ultimate net zero lunacy is probably de-carbonising and trying to electrify the entire railway system. In the first place, the railways...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
Inga kommentarer:
Skicka en kommentar