Fortsätt till huvudinnehåll

Novus Ordo versus Usus Antiquor

Extraordinary form mass - elevation of the host

On Saturday, the Association for Latin Liturgy had an event at St Mary Magdalen's in Brighton, including the celebration of a Solemn High Mass according to the Novus Ordo rite, all in Latin, with the priest in the ad orientem position and sung Gregorian Chant throughout, apart from the readings which were in English.

This is as good as the Novus Ordo Mass can get, but it raises questions. Ever since Pope Benedict announced that the Tridentine form had never been abrogated and that no special permission was required for its celebration, an increasing number of parish priests, though still a small minority, have been using this rite, now known as the Extraordinary Form. At St Mary Magdalen's we have it every Friday evening, and once a month on a Sunday afternoon. These liturgies have attracted a regular following, with a good proportion of young people, and now that we are used to it, comparison with the Novus Ordo Mass in Latin is instructive.

From the perspective of someone in the congregation, the first impression is that there is very little difference between the two. The second impression is the amount of time taken for the recitation of the Canon of the Mass in Latin in the newer rite, which would be silent in the older rite, with the singing of the Sanctus taking place at the same time. The effect in the new mass is to prolong it unduly and to no apparent gain. For a lay person not familiar with Latin ie nearly everyone, the Tridentine Mass is actually more accessible. Which makes me wonder if the Novus Ordo has any future in the longer term.

Kommentarer

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...