The recent bad weather led to widespread cancellations of trains on routes south of London, electrified on the third-rail system. As a result, it has come under criticism, with calls for it to be replaced by overhead electrification.
That is not, of course, going to happen and would be a waste of money even if the cash was available. The third-rail electrification system is fundamentally robust and needs little attention most of the time, by contrast with overhead systems which need regular adjustment and can be brought down be a faulty pantograph.
During a similar spell of cold weather in the 1980s, a railwayman told me that the CIGs were nowhere near as good as the older stock when the weather was icy. The difference was that on older trains, the pick-up shoes were attached to massive timber beams like those in the trains in the picture. This enabled them to smash through the ice on the conductor rail.
I don't know if there is any truth in this but it looks as if a bit of research in this area could lead to improvements which would not cost any great amount.
måndag 6 december 2010
Third-rail deficiencies
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The ultimate net zero lunacy is probably de-carbonising and trying to electrify the entire railway system. In the first place, the railways...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
1 kommentar:
Interesting point - funny how third rail could throw away a major advantage simply by omitting a timber beam...
Could also be an opportunity to improve the theoretical maximum speed from 100mph
Skicka en kommentar