The projected opening time for the high speed line to Birmingham is 2026. In the meantime about £25 billion will have been spent without a single passenger travelling on any of the route. The interest charges on this sunk investment are horrendous.
Compare this to, say, the alternative of upgrading and electrifying the Chiltern line to Birmingham, where the pay-back would begin as soon as the wires had reached High Wycombe, with further gains as the electrification included Bicester and Oxford, and more again when it got to Banbury. Add in a possible electrification from Basingstoke to Oxford and Banbury, and the approved electrification of the Great Western route from Paddington to Oxford, and the gains add up to a significant enhancement of the national network of electrified routes. And all of these generate returns on the investment as each stage of the project is completed.
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The ultimate net zero lunacy is probably de-carbonising and trying to electrify the entire railway system. In the first place, the railways...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
Inga kommentarer:
Skicka en kommentar