The opening of Crossrail has been delayed by yet another year. It never was a good scheme. The stated need was for additional capacity on the northern section of the Metropolitan between Paddington and Liverpool Street. This could have been met by a new tube line between Paddington and Liverpool Street, on the same alignment as Crossrail. Because these are not logical starting points, it might have run westward to Heathrow and/or Hammersmith (the Metropolitan branch), and eastward to Stratford or Woolwhich, but as a tube.
With no need to run on the national network, and running in tunnels of just over half the diameter, it could have been completed 15 years ago at a fraction of the cost.
This was a bad case of mission creep. Like HS2.
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
-
The Four Freedoms are a recipe for strife unless they are accompanied by a Fifth Freedom. Land needs to be free, free as air. And freedom to...
Inga kommentarer:
Skicka en kommentar