lördag 24 mars 2018
GWML electrification disgrace to British engineering
The Great Western Main Line electrification makes slow progress. Between Swindon and Bristol Temple Meads the project has been abandoned due to the cost, which is a mercy as it avoids disfiguring the Cotswold landscape. The work to Cardiff proceeds, much delayed, as here at Bristol Parkway. The overhead structures look as if they were designed to carry the weight of the trains, not the thin contact wires and supporting catenary.
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
-
The Four Freedoms are a recipe for strife unless they are accompanied by a Fifth Freedom. Land needs to be free, free as air. And freedom to...
Inga kommentarer:
Skicka en kommentar