The new GW electrification is noteworthy for the chunkiness of the overhead structures, which are heavier than the notably solid gantries installed for the 1500kV Great Eastern electrification which was installed in 1949. One of the reasons for the adoption of 25kV electrification was that the smaller current flows made it possible to use thinner and lighter contact wires, and consequently lighter and cheaper structures. The Great Western's tunnel of steel must come at a commensurately heavy price, which has helped to push further electrification schemes into the realm of the unaffordable.
The overhead structures for the 15kV system used in Switzerland, Germany and Sweden are like gossamer in comparison. What has happened to let loose this orgy of over engineering?
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The British are phlegmatic, tolerant and slow to rouse. Thus there was no great reaction after the terrorist attack in July 2005. The murder...
-
The Four Freedoms are a recipe for strife unless they are accompanied by a Fifth Freedom. Land needs to be free, free as air. And freedom to...
Inga kommentarer:
Skicka en kommentar