Were the standards a waste of money?

An article in this month's Steam Railway discusses the standard fleet of British Railways steam locomotives built to new designs between 1951 and 1960. There were 999 of them, and all were out of service by 1968, so they were not good value for money. Were British Railways' engineers to blame?

The story is long forgotten, but, as the article reminds us, the British Transport Commission had a sudden change of plan in the mid-1950s and diesel locomotive types which were on order in small numbers for comparative trials were ordered in large numbers before the test locomotives had even been delivered. This change of plan was imposed on the horrified engineers. Whole fleets of the diesel locomotives were effectively prototypes and the engineers were saddled with the task of resolving the teething troubles. In the case of some of the classes, the teething troubles were never resolved and the expensive hardware - typically costing five times as much as the equivalent steam locomotives - went to the scrapyard even faster than the "Standards".

Thus, all the planning that had been done to supersede steam traction in an orderly way was set aside and dieselisation was conducted in a rush. In France and West Germany, steam remained in use for another ten years or so.

The article suggests that had economic considerations applied, the locomotives would have continued in service until the early 1990s, as intended. What the article does not mention in the article is that, as information has come to light both through research, release of documents and experience of the locomotives in preservation, they were exceptionally well-designed both overall and in detail, being almost free of inherent flaws. The 8P Duke of Gloucester and the 9F 2-10-0 were an outstandingly good designs. They would have had particularly long service lives.

They would then have retro-fitted with the technical improvements developed by Porta, Wardale and Waller, that took place from the mid-1970. In that case they would probably still be in service on secondary routes currently operated by Sprinters and Pacers, as well as on infrastructure trains where long periods are spent doing nothing at all. In fact, it is not impossible that additional locomotives would have been built to replace the original standards as they wore out.

That said, 12 different types was undoubtedly too many. Was there really a need for the 8P Duke, and the Britannia, and the Clan class and the class 5? Or for the class 3 tender and tank engines in-between the class 4 4-6-0 and 2-6-0 types, and 2-6-4 tank, and the class 2 2-6-0 tender locomotive and the 2-6-2 tank.

It is good to see this deplorable series of events brought to attention. It is an excellent illustration of the expensive damage that can be done through political interference.

Kommentarer

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...