Fortsätt till huvudinnehåll

The BT10 bogie



An unsung design classic
The BT10 bogie is fitted to mark 3 Inter City stock, including the HST trailer cars. Introduced in the mid-1970s, some units have now been in service for 35 years. These were amongst the first to be fitted with disc brakes and for several years there were complaints about the smell. But once this had been cured, they proved to be exceptional, giving a smooth and steady ride at high speed on indifferent track. Recent tests have shown them to be superior to more recent designs, as well as being significantly easier on the track.

I was discussing this with a colleague recently who has been involved recently in the maintenance of vehicles fitted with these bogies. Apart from a few minor details, he told me that there are no fundamental weaknesses in the design - such as areas prone to fatigue - and after three decades in service they would have shown up by now.

The elegant simplicity of the concept is revealed in the diagram.

Kommentarer

John London sa…
and this should stop hs2 because?
Physiocrat sa…
The connection is tangentially - there is a lot of perfectly good kit around that is serviceable for many years to come. And plenty of potential routes to run it on, presently in need of upgrading or growing weeds.

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...