How would the high speed lines be paid for?

"Fast Forward" suggest that...

A variety of funding sources could be available to fund a high-speed line. The beneficiaries of HSR extend well beyond HSR users and include freight as well as passenger, the short-haul air sector as well as road users and rail passengers on the existing network too. In addition to direct Government funding other sources might include:
  • Farebox revenue from HSR users;
  • hypothecated charges on road or aviation users,
  • businesses rates and environmental charges;
  • capital grants from strategic beneficiaries such as airports;
  • regional funding – but which is unlikely under current arrangements to stretch very far.
Interestingly, it continues...
  • There is also likely to be some scope to realise major property value uplifts in the vicinity of HSR stations and these could be used to defray some of the capital cost. The extent to which property gains will materialise is largely dependent on the availability of developable land at station locations as well as economic recovery of the property sector. It should be realised that the values are unlikely to be on the scale available to HS1, which was developed to both serve and exploit the Thames Gateway.
  • For Government, funding levels will need to take into account investments and expenditures that can be foregone (for example upgrades or investments on the classic network and other transport modes and other regional regeneration projects) and reduced revenues on the adjacent classic network
This reveals several things. All the external benefits of infrastructure developments eventually turn up in the shape of enhanced land values. These would automatically be captured if a system of land value taxation (ad valorem taxation of the rental value of land) were in place. As advocates of infrastructure development, Greengauge should be aware of this. If they want their project to go ahead, pushing for the implementation of this tax reform gives them the best chance of getting the schemes to happen. Except that the land value enhancement may or may not justify the investment and some forecast of the impact of the project on land values is a good indication as to whether it is good value for money.

The second point is revealing and borne out by French experience. High speed rail will be competing for funds against other transport investment. We may end up with a wonderful high speed network and large tracts of the country deprived of any train services at all.

Kommentarer

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...