Fortsätt till huvudinnehåll

Britain's spare main lines

One of the reasons given for building a new high speed line is that there is a shortage of capacity. Yet there are a several main lines that are well below capacity and could be reinstated without too much trouble.

London to Birmingham
The old Great Western route from London to Birmingham branches off the main line to Bristol at Acton, and then runs via High Wycombe and Bicester to Banbury, Leamington and Warwick to Birmingham Snow Hill. This was a shortening of the Great Western's original main line to Birmingham, which diverged from the Bristol line at Didcot and ran to Banbury via Oxford. The line via High Wycombe and Bicester has just been restored to double track. In the past, there was keen competition for traffic on the Great Western and West Coast routes between London and Birmingham, and there remains plenty of spare capacity on the Western route, which is not electrified.

London to Manchester
On this axis the competing routes were the West Coast route via Rugby and the Midland via Derby. The direct Midland route was closed between Matlock and Buxton is closed and used as a footpath and at present, trains between Derby and Manchester have to make a detour via Dore and Totley. At one time, the Midland had four tracks between London and Toton in Nottinghamshire. One pair of tracks was for passenger trains and the other was for slow coal trains. The second route was at a distance from the passenger route. If the spare route has not been built over, this represents potential spare capacity. The Midland is not electrified north of Bedford and there are no firm plans to go ahead with the work.

The Great Central
This is a spine route running from London via Aylesbury, Rugby, Leicester and Nottingham to Sheffield and Manchester. It has been removed between Aylesbury and Nottingham, apart from a stretch near Loughborough which is run as a museum railway. Much of the line of route remains intact.

The Settle and Carlisle
Running north-south on the western flank of the Pennines, in the 1980s this line was threatened with closure. This was successfully opposed. Eventually the line was thoroughly renewed and it is now an important route for freight, providing relief to the main West Coast route from Preston. The line has connections from Leeds in the south. It is not electrified and this has not been proposed.

Kommentarer

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...