Fortsätt till huvudinnehåll

Crossrail stock decision deferred

London Overground - Canonbury



Following the row over the award of the Thameslink rolling stock contract to Siemens, the Secretary of State for Transport has put the decision about rolling stock for Crossrail on hold.



This project needs a thorough rethink, especially at the western end of the route. It should not run over the GW main line beyond Heathrow Junction. One possible option would be to run the trains onto the Hammersmith branch of the Metropolitan, thereby releasing capacity on the busiest stretch of the Circle Line.



The whole service could then form part of the London Overground system. That answers the fleet procurement question, as a further build of the Bombardier class 378 would do the job nicely.

Kommentarer

dougbamford sa…
Not sure what you mean here? Do you mean that it should replace the Hammersmith and City underground line?
So the Western terminii would be Heathrow and Hammersmith, but in that case it would not run on any current Overground lines. At Acton it is possible to get to the overground network, but that goes north to Watford or South to Clapham via Shephards Bush, I don't see how it relates to Hammersmith.
Physiocrat sa…
It would not be physically connected to the London Overground, though there might conceivably be an interchange near Acton. But Crossrail could have a common fleet of class 378 Electrostars. Or alternatively a run-on build of LU class S.

If it is not going all the way to Reading, then it does not need a new design of rolling stock.

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...