Hydrogen train hype

Hydrogen powered trains are in the news at the moment. They are being promoted as a means of making railways less dependent on carbon as a fuel. The idea is that the unwanted electricity from wind generation can be electrolysed and used as fuel in fuel cells. The system is being trialled in Germany on a new train, the i-Lint, and in the UK on a converted class 321 multiple unit train dating from the late 1980s.

There are at least four snags.
  • The hydrogen has to be compressed and stored in heavy tanks.
  • Overall energy efficiency is about 27%.
  • Fuel cells have a limited life.
  • Cost.
I have attempted to obtain figures for the power output of these devices but a search reveals nothing on the subject, not even on the website of the manufacturer, Alstom. My guess is that it is around 1000 hp, about the same as diesels such as British Railway class 20, or a class 4 steam locomotive such as the 80xxx class 2‑6‑4 tank class. The latter, burning light oil and with draughting modifications to suit, turn in a thermal efficiency of around 12%. Because steam locomotives have a small number of large parts, they are relatively inexpensive to manufacture using modern CADCAM and 3D printing techniques; given a sensible production run, the cost of a locomotive in the equivalent power category should be of the order of £1 million. Given that the capital cost of rolling stock accounts for about a quarter of the cost of running a railway, when will someone drop their prejudices and have a proper look at this supposedly outdated technology?

As for the unwanted hydrogen, there is a simple solution - feed it into the gas grid. This would have to be in defined areas as combustion requires different air:gas volume ratios than are used for natural gas. The hydrogen can then be used for on-site electricity generation in combined heat and power systems, which results in minimal waste of energy.



Kommentarer

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...