torsdag 16 november 2017
Tunnel of steel not needed after all
It now turns out that the Great Western Main Line's "Tunnel of Steel" was not necessary after all. It seems, as Roger Ford explains in "Informed Sources", that there were design errors which went unnoticed.
There have indeed been problems with overhead electrification on the East Coast Main line, which was carried out to super-economical standards, but the West Coast route, electrified in the 1970s, has performed reliably even though it passes through some of the most exposed uplands in the country; in comparison, it looks like gossamer.
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The ultimate net zero lunacy is probably de-carbonising and trying to electrify the entire railway system. In the first place, the railways...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
Inga kommentarer:
Skicka en kommentar