fredag 21 december 2012
London Overground took another 40 years
Ticket dated 11 November 1972, issued for a special railtour to demonstrate the practicability of a train service around London. A service on what is substantially the same route eventually opened on 9 December 2012, forty years and one month later. The train used was a DMU from Cricklewood, normally used on the St Pancras - Bedford route until electrification in 1975.
The train ran from Broad Street to Richmond, where it reversed and ran to Clapham Junction and then to Woolwich. After that it ran back via Clapham Junction and Olympia to Willesden Junction, then via Gospel Oak and South Tottenham to North Woolwich, then via Stratford to Broad Street. It must have reversed somewhere as the east curve at Dalston Junction had been closed by then and consisted of just the two platforms (lower photograph).
The train service which opened in phases from 2010 has transformed travel in London's inner suburbs.
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The ultimate net zero lunacy is probably de-carbonising and trying to electrify the entire railway system. In the first place, the railways...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
Inga kommentarer:
Skicka en kommentar