Nothing much has been said about the interaction between HS2 and IEP. The latter provides for 27 years from 2015 - which brings us up to 2042. If HS2 goes ahead at all, a substantial amount of it will be built by then, and there will also be significant running of trains on both HS2, at around 300 kph and the classic network at 200 kph. HS2 will be constructed to a wider European envelope to accept trains such as the French TGV and the German ICE.
How does IEP fit into this scheme of things?
Prenumerera på:
Kommentarer till inlägget (Atom)
Battery trains fool’s gold
A piece by the railway news video Green Signals recently reported the fast charging trials for battery operated electric trains on the West ...
-
I wrote to my MP on two entirely separate issues recently. The first was to do with the replacement for the Inter City 125 train, which at £...
-
The ultimate net zero lunacy is probably de-carbonising and trying to electrify the entire railway system. In the first place, the railways...
-
The FT has run a couple of pieces on Sweden this week. The first was a report of the outbreak of car burning, the second, today, on the rise...
Inga kommentarer:
Skicka en kommentar