WestHampsteadR0017960

I am not an advocate of Buying British in principle, but Derby would almost certainly have got the Thameslink train order if there had been some rational thinking about Thameslink itself. There is no conceivable train that can operate the route satisfactorily as it comprises two inter-urban routes, two airport links and an inner city metro all in one.

Thameslink should have been cut back to operate within the area of the Greater London Authority. Anyone who has used the service regularly and thought about it must realise this. A problem at, say, Brighton will result, a couple of hours later, in disruption at Bedford, and vice versa. This is not unusual as both the Brighton and Midland main lines carry dense traffic. It would have been better to cut back the route and transfer it to London Overground which is a similar type of service. The trains could then have been a further build of Bombardier class 379 Electrostars.

For the long distance routes a further build of class 377 Electrostars would have done the job perfectly well. A small additional fleet of Electrostars has already been running on Thameslink for the past couple of years. These are fully compatible with Southern's existing fleet so the operators can help each other out when things go wrong. This results in a bit of mixing and borrowing as required.

The introduction of Siemens stock will preclude this as it will almost certainly not be operationally compatible with the Electrostar fleet with which it will share the tracks.

Had the DfT made this a requirement as it most obviously should have been, it is most improbable that the order would gone anywhere else than to Derby. However good the Siemens bid may have been, it has not resulted in a best buy.

I blame the civil servants at the DfT.

Kommentarer

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...