Fortsätt till huvudinnehåll

Fares and rolling stock - the missed connection



The McNulty committee has produced a 350 page report on whether Britain's railways give value for money and how things might be improved. Proposed changes to fares have naturally received the most attention and comment, but there is an important chapter on rolling stock. The report refers to the lack of standardisation in rolling stock, with the result that some types of train are route-specific and cannot easily be redeployed.

This is noticeable south of London, where each of the three train operating companies now has a fleet which is incompatible with those used by the others. South Eastern and Southern both run Bombardier Electrostars but they have different couplings. South West Trains run Siemens and Alstom fleets which are mutually incompatible, as well as being incompatible with the Bombardier units. And all three train operating companies have trains inherited from British Rail which are incompatible with all the post-privatisation fleets.

This incompatibility should never have been allowed to develop but it seems that the rail franchising authorities were asleep when the critical decisions were being made.

It is in striking contrast to the situation on the same routes in the 1960s, when most of the fleet was standardised to the extent that all the EP types (such as the CIG class above) - everything built between about 1954 and 1974 - were operationally compatible. A train could be composed of stock belonging to any of the different EP classes. In addition, to provide even more flexibility, the class 33 diesel locomotives, the class 73 electro-diesel locomotives, and the REP high powered units could be used with any of the electric EP units, including the TC trailer sets which were specifically designed for push-pull operation.

This is over particular relevance to McNulty's analysis. It seems to have missed the connection between fares and rolling stock design. Recent decades have seen the near-universal replacement of locomotive-hauled stock with unit trains such as Voyagers and Pendolinos. Of fixed length, extra vehicles cannot be added to cater for extra traffic at peak periods. This must be a major reason for the complicated structure of fares which are meant to tailor a variable demand to a fixed supply in an attempt to get round the lack of flexibility.

Until about 1970, the railways had traditionally kept a pool of older vehicles in reserve, which would be brought out at peak periods, but modern methods of railway operation, and modern types of rolling stock rule out this option. It is a pity that McNulty failed to notice this.

Kommentarer

Erik sa…
There was a discussion about the Japanese model for trains. They said that the train station is commercialized to the extreme, with many shops and services for the people who are waiting for the train. And that the income from these is what pays the majority of costs.
Physiocrat sa…
Erik - thanks for this. This is an example of the general principle that railways create footfall, thereby enhancing the value of location.

The land value that railways sustain is largely out of reach of those who construct and operate the systems but there are ways by which it could be captured, for instance through a system of land value taxation or land-rent charge.

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...