Questionnaire
Do you agree that a national high speed rail network from London to Birmingham, Leeds and Manchester (the Y network) would provide the best value for money solution (best balance of costs and benefits) for enhancing rail capacity and performance?

No.

I have read the document on alternative investment strategies. (High Speed 2 Strategic Alternatives Study by W S Atkins).

On the basis of that report, it is simply not true to say that the benefits that they would deliver would be disruptive and poor value for money. In any case there other other alternative strategies which appear not been explored at all, in particular, the construction of a conventional (125 or 140mph speed railway on roughly the same alignment as HS2).

The Rail Interventions section of that report concentrates on upgrades to the West Coast Main Line and the Chilterns route to Birmingham and in case of the latter, an interesting list of interventions are postulated. Amongst the options discussed is the possibility of running much longer trains on the WCML. But this is dismissed in the following sentence:

"However, operating a fleet of 400 metre would require platforms at every station served by WCML “fast” services to be lengthened. Selective Door Opening (“SDO”) is unlikely to prove acceptable or workable."

This curt dismissal of a major policy option is strange because what is called for is better SDO system than those currently in use.

As regards the dominance of London and the South East, there is no reason to suppose that HS2 would reduce this - on the contrary - it could suck business away and simply lead to longer-distance commuting. The appropriate way to balance the UK economy across the regions is through the tax system, so that less tax is payable in areas of geographical disadvantage.

The forecast figures are so conjectural as to be worthless.

Kommentarer

Populära inlägg i den här bloggen

The Zombie Train that refuses to die

The Guardian has published a couple more articles against HS2, one by specialist rail commentator Christian Wolmar, and another today by journalist Simon Jenkins. The main arguments in favour will doubtless be wheeled out by the commentators: the need for capacity and the disruption caused by upgrading existing routes. HST itself will severely disrupt services to Euston during the construction period. Capacity can be increased at a fraction of the cost by a variety of measures, provided that it is accepted that the additional traffic will run at existing speeds. It is not generally known that the Midland main line is, or was, four track all the way from London to Trent Junction, between Nottingham and Derby. This is because the additional tracks are separate, having been added for coal trains which trundled down to Brent sidings, on the edge of London, from a collection point at Toton in Nottinghamshire, where the Midland Railway build a huge marshalling yard. Beyond Derby, the main l...

Importing people to sustain demand

I got involved in a discussion with a Youtuber called “Philosophy all along”. This was in connection with criticism of Trump’s policy of deporting illegal migrants, which he argued would be bad for the economy as it would reduce demand. This implies that there is a need to import people to sustain demand. There is no obvious reason why a population should not be able to consume everything that the same population produces. If it can not, then something else is going on. It is a basic principle that wages are the least that workers will accept to do a job. Wages are a share of the value added by workers through their wages. The remainder is distributed as economic rent, after government has taken its cut in taxes. Monopoly profit is a temporary surplus that after a delay gets absorbed into economic rent. Land values in Silicon Valley are an example of this; it's like a gold rush. The miners get little out of it. Rent and tax syphon purchasing power away from those who produce the g...

Beyond electrification

In an earlier post I suggested a core list of lines which ought to be in an electrification programme spread over twenty years of so. This leaves a residue of routes which it is unlikely will ever be electrified. This include for example All lines beyond Glasgow, Stirling and Aberdeen All lines west of Exeter and Swansea All lines west of Chester Shrewsbury - Chester Everything not listed in my previous blog - electrification plans only scratch surface   Some of these routes carry main line services to London and other cities on parts of the network that are already electrified or included in electrification plans. Others are self contained and others carry light traffic - less than a dozen trains a day. The current plan is that main line services will be operated with the hybrid trains on order from Hitachi, but this is a costly, wasteful and ineffective solution. The performance of the trains will be inferior to the present Inter-City 125 trains on non-electrified lines and the ...